Gap’s 1-megawatt solar power system is now operational
Posted by admin on 13 Oct 2008 at 08:58 am | Tagged as: Solar
A 1-megawatt solar power installation is now in operation at the Gap Inc.’s distribution center in Fresno, California.
The installation has the capacity to generate 1.9 million kilowatt hours annually, enough to power 350 homes. The system should offset 2.5 million pounds of greenhouse gas emissions or the equivalent of taking 2,466 vehicles off the road over the life of the project.
Related posts:
- Kohl’s attempts to reach carbon neutrality by end of 2010. Wisconsin-based Kohl’s Department Stores announced that it will try to...
- US’ largest solar PV plant to open in Florida Florida Power and Light’s DeSoto Next Generation Solar Energy Center...
Related posts brought to you by Yet Another Related Posts Plugin.
