Hydroshearing, the technique of pumping water into a volcano to force steam out, will be tested in Central Oregon.
Over 21 days, AltaRock will pour 800 gallons of water per minute into the 10,600-foot test well, already drilled, for a total of 24 million gallons. According to plan, the cold water cracks the rock. The tiny plastic particles pumped down the well seal off the cracks. Then more cold water goes in, bypassing the first tier, and cracking the rock deeper in the well. That tier is sealed off, and cold water cracks a third section. Later, the plastic melts away.

Recent comments